Draft Proposal for Water Interconnection Study
Attachments:
Attachment NameAttachment SizeAttachment Date
Size: 141K
Last Updated: 2011/10/25
Attached you will find the Draft Proposal from Stantec Engineering pertaining to the Dunstable Water Department (DWD)/Tyngsboro Water District (TWD) Interconnection "project".  This represents the scope of work Stantec will perform in order to provide the Draft Report of the necessary actions/costs required for a successful interconnection.  As always, if you have any questions or input, please contact Chairman, Karl Huber at: kjhjr77@verizon.net



 